The power-up sequence (the order in which power is turned on or off) for the Cyclone® 10 GX is as follows
■ Power-Up Sequence (Power-Up Sequence)
The sequence must be followed.
For details, please refer to the following document.
Note that each power supply must be monotonically increasing and must rise to each voltage level within a specified time (tRAMP).
■Power-Down Sequence (Power-Down Sequence)
The sequence must be followed.
For details, refer to the following document.
Reference information
https://www.intel.com/content/www/us/en/programmable/documentation/vua1487061384661.html
(Search for Power-Up Sequence or Power-Down Sequence)
https://www.intel.com/content/altera-www/global/en_us/index/documentation/muf1488511478825.html
(Search for tRAMP.)
--------------------
Category: Specifications
Tools: -
Devices: Cyclone® 10